Silica Exposure Calculator

OSHA's permissible exposure limit (PEL) for respirable crystalline silica is 50 micrograms per cubic meter of air (µg/m³), and its action level is 25 µg/m³, both as an 8-hour time-weighted average (TWA). A lab report gives a result for each sample and how long the pump ran. Type them in below to get the 8-hour average and what that result requires under the construction or the general industry standard.

Work out the 8-hour average

Type in each air sample result from the lab and how many minutes it ran. You get the 8-hour time-weighted average, where it sits against OSHA's action level and limit, and what that result requires next.

Is this the first monitoring for this job?
8-hour time-weighted average
0 µg/m³

Sum of result × minutes, ÷ 480
Share of the PEL
Next monitoring
Respirator, if controls cannot bring it down

What this result requires

    The formula is OSHA's, 29 CFR 1910.1000(d)(1)(i); the limits and duties are 29 CFR 1926.1153 and 1910.1053; respirator classes 29 CFR 1910.134. General information, not legal advice; a state plan state may set its own rule.

    How the 8-hour average is worked out

    OSHA's formula for a shift's exposure is in 29 CFR 1910.1000(d)(1)(i): E = (CaTa + CbTb + ... + CnTn) ÷ 8, where C is the concentration during a period, T is its length in hours, and E is the equivalent exposure for the shift. The tool does the same sum in minutes and divides by 480. OSHA's own example in that paragraph is 2 hours at 150, 2 hours at 75 and 4 hours at 50, which gives (300 + 150 + 200) ÷ 8 = 81.25. Type those in and the tool gives the same.

    Time that was not sampled adds nothing to the sum, so it counts as zero exposure. That is right only if the worker did no silica work in it. If the samples miss a dusty part of the shift, the average will be too low. The formula is written for an 8-hour work shift, so the tool warns when the samples add up to more than 480 minutes rather than guess how to treat a longer one.

    Both silica standards define employee exposure as the exposure that would occur if the worker were not using a respirator. A sample taken outside the respirator is the one that counts.

    Worked examples

    Samples8-hour TWABandNext monitoringRespirator
    62 µg/m³ for 240 min, 18 µg/m³ for 200 min38.5 µg/m³Action level to PELWithin 6 monthsNot required by the result
    160 µg/m³ for 180 min, 20 µg/m³ for 240 min70 µg/m³Over the PELWithin 3 monthsAPF 10 or more
    100 µg/m³ for 240 min, nothing else50 µg/m³At the PEL, not overWithin 6 monthsNot required by the result
    20 µg/m³ for 480 min, first monitoring20 µg/m³Below the action levelMay stopNot required
    700 µg/m³ for 480 min700 µg/m³Over the PELWithin 3 monthsAPF 25 or more

    A result exactly at 50 is at or below the PEL, so it is in the six-month band, not the three-month one. The standards' wording is "at or above the action level but at or below the PEL" for six months and "above the PEL" for three.

    When to monitor again

    Both standards let the employer assess exposure one of two ways. Under the performance option, any mix of air monitoring and objective data that accurately characterizes exposure will do, and there is no fixed schedule. Under the scheduled monitoring option, the rules are the ones the tool applies:

    • Initial monitoring below the action level: the employer may stop monitoring the workers it represents.
    • At or above the action level and at or below the PEL: repeat within six months of the most recent monitoring.
    • Above the PEL: repeat within three months.
    • A repeat result below the action level: repeat within six months until two results in a row, taken seven or more days apart, are below the action level, then the employer may stop.

    Either way, exposure must be reassessed whenever a change in production, process, control equipment, personnel or work practices could reasonably cause new or higher exposure at or above the action level. Samples must be analyzed by a laboratory that follows Appendix A of the standard. Workers or their representatives must be given the chance to watch the monitoring. Silica objective data and when it replaces air monitoring covers the performance option.

    Telling workers the result

    The deadline differs between the standards. In construction it is within five working days of completing the assessment (1926.1153(d)(2)(vi)). In general industry and maritime it is within 15 working days (1910.1053(d)(6)). Either way the employer notifies each affected worker in writing or posts the results where all of them can see them, and when a result is over the PEL, the notice must describe the corrective action being taken to bring exposure to or below it.

    Over the PEL: controls, then respirators

    The employer must use engineering and work practice controls to bring exposure to or below the PEL unless they are not feasible. Where feasible controls are not enough, they must still be used to get exposure as low as feasible, with respirators on top. Respirators are required while controls are being installed, for tasks where controls are not feasible, and where all feasible controls still leave exposure over the PEL. In general industry they are also required in regulated areas.

    The respirator has to be good enough for the concentration. Under 29 CFR 1910.134 the maximum use concentration (MUC) of a respirator is its assigned protection factor times the exposure limit. With a PEL of 50, an APF 10 half mask covers up to 500 µg/m³, an APF 25 loose-fitting PAPR up to 1,250, and an APF 50 full facepiece up to 2,500. The tool picks the lowest APF whose MUC covers your 8-hour average. A respiratory protection program under 1910.134 is required wherever respirators are.

    Regulated areas, general industry only

    In general industry and maritime, 1910.1053(e) requires a regulated area wherever exposure is, or can reasonably be expected to be, over the PEL. It must be marked off, with signs at every entrance; access is limited to people authorized and required to be there; and everyone who enters gets a respirator and must wear it. The construction standard has no regulated areas. It asks instead for written procedures to restrict access to work areas, in the exposure control plan.

    Medical exams

    The trigger is different in each standard. In construction, medical surveillance is owed to each worker required to use a respirator under the standard for 30 or more days a year (1926.1153(h)(1)). In general industry, it is owed to each worker exposed at or above the action level for 30 or more days a year (1910.1053(i)(1)), whatever the respirator. So a plant worker at 30 µg/m³ for 60 days a year is owed exams, and a construction worker at the same level is not, unless a respirator is required. The exams are at no cost to the worker, with a first one within 30 days of assignment and repeats at least every three years.

    Construction tasks on Table 1

    In construction, a task listed on Table 1 and done with its controls fully and properly in place needs no exposure assessment. The Table 1 checker shows the controls and respirator for each listed task. Every covered employer still needs a written exposure control plan, which the plan builder drafts. The OSHA silica standard explained sets the whole rule out.